SwagerBuilds LLC · 4510 E 168 N, Rigby, ID 83442 · (208) 520-0636 · Idaho Contractor Registration RCE-57499

Category: Cost & Budget

Real cost numbers, budget breakdowns, and pricing guidance for custom homes in Driggs, Teton Valley, and Eastern Idaho.

  • Building a Second Home in Teton Valley as a California Homeowner: The Honest Cost + Timeline

    Building a Second Home in Teton Valley as a California Homeowner: The Honest Cost + Timeline

    If you live in San Francisco, Palo Alto, Marin, Newport Beach, or anywhere else in California, and you’re thinking about building a second home in Teton Valley — Driggs, Victor, Tetonia, or Alta — this guide is for you. Specifically for you.

    I get on a Zoom every week with a California family who’s flown into Jackson once or twice, fallen for the west side of the Tetons, and started running the numbers. The questions are always the same: what does it really cost compared to California, how long will it take, do my California architect’s drawings work in Idaho, and — the question nobody says out loud — can I actually trust a builder 800 miles away.

    I’m Bryce Swager. I own SwagerBuilds, based in Rigby, Idaho. We build custom homes in Teton Valley and across Eastern Idaho. About a third of our active projects right now are owned by California families building their second home here. This post is the honest version of the conversation we have on that first Zoom.

    How Idaho build costs actually compare to California

    The first thing to know: Teton Valley is not the cost-relief story you might be told over dinner in Atherton. It’s still cheaper than Bay Area or Orange County construction — but the gap is smaller than buyers expect, and it’s been closing every year.

    Here’s the realistic 2025 picture for a comparable, mid-to-high-finish home:

    • Bay Area or Orange County custom (California market data): roughly $800–$1,400+ per square foot, depending on neighborhood and finish tier
    • SwagerBuilds in Teton Valley (Driggs / Victor): starts at $400/SF and goes up. That’s construction cost on conditioned square footage only, with a fixed price once the design is locked.

    Here’s one worked example. A 2,000 SF home at $400/SF is about $800K in construction. All-in (site work, permits, architect, landscape, furnishings) typically adds about 30%, roughly $1.04M. Land in Driggs or Victor is on top of that, often $200K to $800K+ depending on lot, view, and acreage.

    The cost gap vs. California is real, but it’s not the 50%+ savings some buyers expect from a Zillow scroll. Teton Valley trades cost more than Idaho Falls trades because the labor pool is smaller and competes with Jackson on the other side of the pass. Lumber, steel, and finished goods all carry an upcharge for freight. Snow load engineering raises every structural number. Add it all up and the gap is smaller than the headline per-square-foot numbers suggest. For the full breakdown, the Idaho custom home cost guide walks every line item.

    The Teton County permit timeline — what California buyers need to know

    This is the part that surprises Californians the most. Not because Teton County, Idaho is slow — it’s actually faster than most California jurisdictions — but because the shape of the timeline is different. Plan review and permit issuance is typically 6–10 weeks for a clean engineering package, vs. 4–12+ months in many CA jurisdictions. Septic permitting through Eastern Idaho Public Health runs in parallel (add 2–6 weeks if soils tests get complicated). Plat-specific design review applies in many Driggs and Victor subdivisions — CC&Rs can dictate roof pitch, exterior materials, and color palette. Read them before you finalize plans. No CEQA equivalent. NEPA only matters on federal land, which most lots aren’t on.

    The county follows the 2018 IRC with local amendments. The Teton County Idaho Building Department is reasonable to work with if your plans are clean. It is unforgiving if they’re not — which is the bigger point.

    PhaseDurationNotes
    Design + engineering3–6 monthsFaster if you reuse an existing plan
    Permits + soils + septic6–12 weeksRuns partly parallel with design
    Build (groundbreak to keys)12–16 monthsShort build season at 6,200 ft
    Punch list + landscape close-out2–4 monthsUsually after move-in

    So from “we have a lot and a builder” to “we have keys” is typically 18–24 months. Plan to keep your California life going during that time — most clients fly in 2–4 times during the build.

    Snow load, frost depth, water rights — the structural realities

    This is where California architectural assumptions break down most often. Snow load. Ground snow loads in Driggs and Victor run 70 to 90 psf, some sites 100+. Trusses, foundations, and framing all change. Frost depth. Teton County engineers to a 42-inch frost depth. Foundations go deeper. Water rights. Idaho is a prior-appropriation water state. If your lot is on a well — most rural Teton Valley lots are — confirm water rights with the Idaho Department of Water Resources before closing. Confirm before closing on the lot. This is the single biggest mistake out-of-state buyers make. Septic. Soils tests through Eastern Idaho Public Health are required and can take weeks. Septic itself is typically a $25K–$60K line item, more on tougher soils. Floodplain. Check the FEMA Flood Map Service Center and the USGS National Hydrography Dataset before committing to a lot.

    If you’re building from California: factor in one trip to Idaho before you close on the lot. Walking the site with your builder before purchase saves more money than any other single decision you can make in the first 60 days.

    Will your California architect’s plans work in Teton Valley?

    Sometimes. Mostly with modifications. Almost never as-is. The most common issues we see when a California architect’s drawings come in:

    • Roof structure sized for CA snow loads (typically 30 psf or less) — re-engineered for 70–90 psf.
    • Foundation has to go deeper for the 42″ frost depth.
    • Insulation and envelope upgraded for Climate Zone 6 — typically R-30 walls, R-49+ roof, high-spec windows.
    • Mechanical sized for mild winters has to handle real cold. Snow melt at entries and driveways is common.
    • Roof pitch and shed direction — California flat-and-low aesthetics often reworked for snow shed and ice management.

    Path 1: Keep your California architect, partner with an Idaho structural engineer. The CA architect drives design intent; an Idaho-licensed structural engineer adapts the package to local code. Cleanest path for high-design California families. Path 2: Use a Teton Valley architect from the start. Teton Valley architects know snow, ice, view orientation, and local design review by default. The wrong path is bringing CA drawings to Teton County and assuming nothing changes.

    How we manage your build while you’re 800 miles away

    The question nobody asks first but everyone has: can I really trust a builder I can’t show up unannounced to check on? The honest answer is yes — but only if the builder is set up for it. Most aren’t. Here’s what we do:

    • Live job-site cameras on every active build. Log in from Palo Alto or Newport Beach and see what’s happening this minute.
    • JobTread daily logs. Every day, your PM posts photos, notes, and what’s planned for tomorrow.
    • Dedicated PM per job — not the owner. A project manager responsible for your specific build who you can text directly.
    • Weekly Loom updates. A 5–10 minute walk-through of the week, every Friday. Watch it Saturday morning over breakfast.
    • Full line-item budget visibility in JobTread. Every change order, every invoice, every PO. No mystery.
    • Inspector schedule transparency. You know what inspections are coming and what passed.

    That stack is what makes a remote build trustworthy. If a builder doesn’t have something like it, they’re not set up for California ownership. Walk. The deeper version of how this works is in How California Homeowners Manage a Custom Home Build From 800 Miles Away.

    A realistic budget + timeline for a Bay Area or Orange County family

    A realistic profile: family of 4–6, primary residence in SF Bay Area or Orange County, second home for family use 8–14 weeks/year with occasional rental, target 3,000–4,500 sq ft, 4–5 bed, 4–5 bath, garage for 2–3, ski/mudroom, bunk room, mid-to-high finish, real wood, real stone, comfortable but not Aspen-trophy.

    Realistic budget: Start with the house. SwagerBuilds construction starts at $400/SF and goes up, on conditioned square footage, and the price is fixed once the design is locked. Then add the all-in costs: site work, permits, architect, landscape, and furnishings (often forgotten) typically add about 30% on top of construction. Land is separate, often $300K–$800K in Driggs or Victor. Carry a 10% contingency on hard costs. The 2,000 SF example above (about $800K in construction, roughly $1.04M before land) scales from there.

    Realistic timeline: Design + engineering 4–6 months. Permitting + site prep 2–3 months (parallel). Build 14–16 months. All-in from contract to keys: 10–16 months. Anything tighter is wishful thinking. Anything looser is bad planning.

    Where to start as a California buyer

    1. Visit the valley in winter and summer. Driggs in February and Driggs in July are different towns.
    2. Walk lots with a local builder before buying. Site conditions move budget more than floor plans do.
    3. Confirm water rights and snow load on every lot you’re serious about — before you close.
    4. Decide between Driggs and Victor early. See Driggs vs Victor for Bay Area families.
    5. Get a real builder shortlist. Use How to Choose a Custom Home Builder in Idaho and the 12-question vetting checklist in The Honest Guide.

    FAQ

    How much does it cost for a California family to build a second home in Teton Valley?

    SwagerBuilds construction in Teton Valley starts at $400/SF and goes up, on conditioned square footage only, with a fixed price once the design is locked. A 2,000 SF home at $400/SF is about $800K in construction. All-in (site work, permits, architect, landscape, furnishings) typically adds about 30%, roughly $1.04M. Land is on top of that.

    How long does it take to build a custom home in Teton Valley from California?

    Plan on 20–24 months from contract to keys, including 4–6 months of design and engineering, 2–3 months of permitting (parallel), and 14–16 months of construction.

    Can my California architect’s plans be used in Teton Valley?

    With modifications, almost always. As-is, almost never. Snow load, frost depth, insulation, mechanical, and roof shed all need to be re-engineered for Climate Zone 6 and Teton County code.

    How do I manage a custom home build remotely from California?

    The minimum modern stack: live cameras, daily PM logs in JobTread, a dedicated PM, weekly Loom updates, and full line-item budget visibility. If your builder doesn’t have all five, they’re not set up for out-of-state ownership.

    Is it better to build in Driggs or Victor as a Bay Area family?

    Both work. Driggs has more restaurants, the airport, the rodeo grounds, and is closer to Grand Targhee. Victor is smaller, slightly more rural, and 15 minutes closer to Jackson over the pass.

    Do I need water rights to build a second home in Teton Valley?

    If your lot is on a well — most rural Teton Valley lots are — yes. Idaho is a prior-appropriation water state. Confirm with the Idaho Department of Water Resources before closing.

    What’s the biggest mistake California buyers make in Teton Valley?

    Closing on a lot before walking it with a local builder. Site conditions move the budget more than floor plans do.


    Author: Bryce Swager — owner-builder at SwagerBuilds. Working with Bay Area and Orange County families to build second homes in Teton Valley since 2019.

    Ready to talk through your Teton Valley second home? Request a planning call →

    Related reading for California buyers

  • Why Most Custom Builds Go Over Budget (And How Real Systems Stop It)

    Why Most Custom Builds Go Over Budget (And How Real Systems Stop It)

    Twenty years watching custom home builds quietly bleed 20–40% over their contract number is the reason SwagerBuilds runs the way it does. 20-year Rigby builder — I’ve seen every way a job silently leaks money in this valley, and I built the entire SwagerBuilds operating system around the systems most builders won’t run. That’s why every SwagerBuilds project today runs on JobTread, written change orders before work moves, and a real fixed-price contract.

    If you’ve heard custom home horror stories — 30%, 40%, 50% over budget — here’s where the money actually disappears, and what builders who don’t bleed your equity do differently.

    The five places budget vanishes

    1. Verbal change orders

    “Hey, can we move that wall four feet?” “Sure, no problem.” Three weeks later the change shows up on the invoice for $14,800 and the owner is furious. The fix is simple and most builders don’t run it: no work moves until the change order is written, priced, and signed. SwagerBuilds will not pour, frame, or trim against a verbal change. Every PO references a signed change order or it doesn’t get released.

    2. Allowance shortfalls

    “Tile allowance: $25,000.” Owner picks $90,000 worth of tile. The overage is on the owner — but most builders don’t surface it until the bill comes in. JobTread tracks allowance burn in real time. Pick the $90K tile and the system flags it the same day. You decide: spend it, or pick something else. Either way, no surprise.

    3. Underestimated site work

    The lot looked fine. Then we hit lava rock at four feet, and the foundation budget went up $42,000. The fix: real geotech reports before the contract is priced. Most builders skip the geotech to save the owner $4,000. The other 96% of the time they pay $40,000 to find out. Math math.

    4. Procurement delays that turn into expedite fees

    “The cabinets are eight weeks out.” Owner needed them in four. Now there’s a $7,200 expedite fee, or a four-week schedule slip that costs more in carrying costs than the expedite would have. SwagerBuilds orders long-lead items the day the contract signs. Cabinets, windows, custom doors, tile that ships from Italy — all on the procurement schedule before framing breaks ground.

    5. Sub markup creep

    The sub bids the job at $X. Three weeks later submits a “supplemental” for $0.3X. Then another. Every SwagerBuilds sub has a written scope and a fixed bid before they touch the project. Supplementals require my approval and a written change order. Most builders fold and pass it through. I don’t.

    What “fixed-price” actually means

    Fixed-price means the number we agree on is the number you pay — for the scope we agreed on. If you pick $90K tile against a $25K allowance, that’s an allowance overage you signed off on, not a fixed-price violation. If your soil hides a granite shelf at four feet, that’s a written change order with a stamped engineer’s quote, not a “trust me, this’ll be fine.”

    The trick isn’t avoiding overages. The trick is making sure the only overages that hit your invoice are ones you saw, priced, and signed before they happened. Our process is built around exactly that.

    The owner’s job

    • Lock selections before framing. Every undecided finish is a future change order.
    • Read every change order before signing. Yes, all of them. They’re short on a SwagerBuilds project.
    • Don’t say “while we’re at it…” Or — say it, with full awareness that it’s a written change order at written-change-order pricing.
    • Watch your allowance burn rate. JobTread shows it. Most owners don’t look.

    You can build a $2M custom home and land within 1–2% of the contract number. I do it. Request a planning call → if you want to know how the math works on your specific scope.

    More on this: About SwagerBuilds · Read real reviews · JobTread case study

  • Honest Cost to Build a Custom Home in Teton Valley (2026)

    Honest Cost to Build a Custom Home in Teton Valley (2026)

    What It’s Worth When It’s Done: Teton Valley Market, October 2026

    Construction cost is half the picture. The other half is what the finished home is worth, and we’d rather you see both.

    In October 2026, Carl Struttmann at Compass Teton Valley pulled sold comps for Driggs and Tetonia, half-acre to 3-acre lots, 1,500 to 3,000 square feet. Seven sales, averaging about 2,200 square feet.

    Average sold price: $507 per square foot, land included.

    Set that against our $400/SF construction anchor:

    2,000 SF homeFigure
    Buy existing (2,000 × $507)≈ $1.01M, land included
    Build new, construction only≈ $800K
    Build new, all-in (+≈30%)≈ $1.04M, plus lot

    At 2,000 square feet, the October 2026 Compass Teton Valley resale average comes to about $1.01M with land. A SwagerBuilds custom home is about $1.04M all-in before the lot, roughly $30K more. The premium buys current energy code, a new roof, furnace and water heater under warranty, your own layout, and a fixed-price contract with a 2 to 3% contingency and no allowances. Carl Struttmann says new construction “will command additional value” over resale comps. Needed updates to an older home can narrow the gap.

    Rounded: about $800K in construction and about $1.04M before land.

    On the west side: we’re building new homes in West Ridge Ranch, off Packsaddle Road, in the 2,000–2,200 SF range, positioned in the $1.0M–$1.2M market range Compass identified for new construction there.

    Full breakdown: Build vs. Buy in Teton Valley, 2026.

    Market data: Carl Struttmann, Compass Teton Valley, October 2026 CMA, Driggs/Tetonia sold comps. Updated quarterly.

    Is it cheaper to build or buy in Teton Valley?

    Buying is cheaper up front. October 2026 Driggs and Tetonia sales averaged $507 per square foot with land, so a 2,000-square-foot existing home is about $1.01M. Our comparable custom build is about $1.04M all-in before land, roughly $30K more. Older-home updates can narrow that difference. See the full comparison.

    What is a new home in Driggs or Tetonia worth?

    Compass Teton Valley priced well-built new construction on the west side in the $1.0M–$1.2M range in October 2026, above the $507/SF resale average, because new construction carries a premium.

    What this guide covers

    Short answer: The cost to build a custom home in Teton Valley starts at $400 per square foot of interior living space and goes up from there. A 2,000 square foot home at that entry point is about $800K in construction cost and roughly $1.04M before land once you count site work, permits, architect, landscape and furnishings, which typically add about 30%. Where your own build lands above the entry point comes down to your lot, your architecture, and your finishes, not how a builder counts square footage.

    The honest cost to build a custom home in Teton Valley in 2026 starts at $400 per square foot of interior living space, and climbs from there based on three things: what your lot demands, how complicated the roof and glass are, and what you pick for finishes. That’s construction cost only. Anyone handing you a firm number before they’ve walked your lot and seen plans is guessing, and a guess dressed up as a quote is how budgets fall apart in month four.

    What does it cost to build a custom home in Teton Valley in 2026?

    Construction starts at $400 per square foot of interior living space and goes up. That figure is measured on conditioned square footage only, heated, enclosed living space, with no garage padding and no covered-porch padding.

    What that looks like in practice: a 2,000 square foot conditioned home at the entry point runs about $800K in construction cost. All-in (site work, permits, architect, landscape, furnishings) typically adds about 30%, and you’re at roughly $1.04M to be in the door. Most SwagerBuilds projects land somewhere in the $1M–$5M range once everything is counted.

    I won’t publish a tier chart telling you that “mid-range” costs one number and “high-end” costs another. Those charts look precise and aren’t. Two houses at identical square footage and identical finish level can differ by several hundred thousand dollars because one sits on a flat serviced lot in town and the other needs a well, a septic system, a 400-foot power run and a driveway that has to be plowed all winter.

    Cost to build a custom home in Teton Valley, finished exterior of the Arbogast Home with stone wainscot and post-and-beam entry, Driggs, Idaho
    The Arbogast Home on Mt. Moran Rd, Driggs, a full-scope Teton Valley custom build.

    Why do two builders quote such different numbers for the same house?

    Usually because they’re not measuring the same thing. Conditioned square footage means the heated, enclosed part of the house, the space you actually live in. It excludes an unheated garage, an unfinished basement and an unheated attic.

    A builder who includes the garage and the covered porch in the square footage can advertise a per-foot number roughly 25% lower without a single thing changing about the house. Nothing got cheaper. The denominator got bigger. When you’re comparing quotes, make every builder tell you which square footage they used before you compare anything else, it is the fastest way to misread the cost to build a custom home in Teton Valley. I wrote up how to normalise competing quotes in cost per square foot to build in Teton Valley.

    What’s not included in a per-square-foot price?

    This is the question that catches people, so here it is plainly. The advertised cost to build a custom home in Teton Valley almost never includes:

    • Site work: clearing, excavation, septic, well, driveway and approach. Budget $80K–$250K depending on the lot. On a rural Teton Valley parcel this is the single biggest variable in the whole project.
    • Permits and impact fees: Teton County and the City of Driggs both charge residential impact fees on top of permit fees. Plan $15K–$30K.
    • Stamped engineering: structural, energy compliance, geotech. $10K–$25K.
    • Landscape: anything past rough grade. $30K–$200K and up.
    • Furniture, art and FF&E: its own line, and routinely forgotten. Six figures on a luxury home.
    • Idaho sales tax on materials, plus the 5–10% contingency I recommend carrying on every build.

    Those are market figures, not my rate card. They move with the lot and the year, and I’d rather you see them up front than discover them at framing.

    Where does the money actually go?

    Here is how the cost to build a custom home in Teton Valley typically allocates across the trades. Percentages of construction cost:

    • Site work and foundation: 8–12%
    • Framing and structural: 15–20%
    • Mechanical, electrical, plumbing: 12–15%
    • Insulation, drywall, interior framing: 6–9%
    • Windows and exterior: 10–14%, the biggest swing on the list
    • Cabinetry and millwork: 8–12%
    • Tile, stone, countertops: 6–10%
    • Flooring: 4–6%
    • Lighting and fixtures: 3–5%
    • Landscape: 4–8%
    • General contractor fee and overhead: 12–18%

    What moves the price the most?

    1. The window package. A standard high-quality window versus a custom European steel unit can move a build by several hundred thousand dollars on its own. If you want to control the budget, this is the first lever.
    2. Cabinetry and millwork. Production cabinets versus custom alder or walnut milled in my Rigby shop is a similar swing. The shop work is why our houses look the way they do, and it is a choice you make with your eyes open.
    3. Site complexity. A walk-out basement on a sloped lot in a high-snow zone with a long driveway costs meaningfully more than a flat lot on city services. Roof systems here get engineered for 60–100+ PSF snow loads, and footings go below a deep frost line, that structure is not optional and it is not cheap.

    Do I need plans before you can give me a price?

    You need plans before anyone can give you a price worth trusting. That’s what the design agreement is for. It runs 12–16 weeks and it produces plans, stamped engineering, locked selections, real subcontractor bids, lot feasibility, and a preliminary construction budget in the schematic phase, so you see real money well before you sign a construction contract.

    The fixed construction contract price comes at the end of that process, not before it. The design agreement is a paid deliverable with a fixed fee, starting at $25,000 and quoted per project. I don’t hand out project budgets outside it, not to be cagey, but because a number produced without your lot, your plans and real bids behind it isn’t worth anything, and you’d be right to hold me to it later.

    Who handles the design, drawings and engineering?

    I do. You don’t need to go assemble a team before you can talk to me. Plan development and architectural drawings are coordinated in-house, with same-week revisions rather than waiting on an outside firm’s calendar. Structural, civil and mechanical engineers are people I’ve worked with for twenty years, which matters here because stamped snow-load engineering, setbacks and wastewater drive the Teton Valley timeline more than anything else.

    Interior selections, cabinetry, millwork, lighting, tile, get coordinated on the same schedule, in the order that keeps them from blowing the build sequence. Permitting through Teton County or the City of Driggs is mine to run. You don’t talk to the building department.

    If you want the local specifics, the Driggs custom home builder page covers permitting, design review boards and snow-load engineering in detail, and the Teton Valley builder page covers how a build actually runs.

    What are the local rules that affect my budget?

    Teton County, Idaho enforces the 2018 I-Codes family through the Building Department at 150 Courthouse Drive in Driggs, and publishes a residential fee estimator you can use before you commit (tetoncountyidaho.gov). One quirk that catches everyone: personal cheques are capped at $5,000, and a full custom home permit almost always exceeds that. Idaho’s adopted energy code is the 2018 IECC with state amendments (Idaho DOPL adopted codes).

    Two local rules shape the cost to build a custom home in Teton Valley more than most people expect. Many valley subdivisions run their own design review boards on top of county permitting, with written standards on materials, roof pitch, colours and outbuilding placement. Review can add 30–90 days. It belongs in your schedule from day one, not as a surprise in month four.

    Frequently asked questions

    What is the cost to build a custom home in Teton Valley per square foot?

    Construction starts at $400 per square foot of interior living space and goes up from there. A 2,000 square foot conditioned home at the entry point is about $800K in construction cost and roughly $1.04M before land. Your lot, architecture and finishes decide where you land above that.

    How long does a custom home take to build in Teton Valley?

    Plan on 12–16 weeks of design agreement up front, then 10–16 months from signed construction contract to move-in. Permitting runs 2–3 months of that, longer if a design review board is involved. The practical exterior season is April through October, so foundation and dry-in have to land before the first hard freeze.

    Can you give me a ballpark before I have a lot?

    I can tell you the entry point and the worked example above, and I’ll walk a lot with you before you write an offer at no charge. What I won’t do is put a project budget in writing before a signed design agreement, because on a Teton Valley build the lot decides too much of the number.

    How do construction costs for building a home in Wyoming compare to buying an existing home?

    On the Wyoming side of the Tetons, building costs more per square foot than buying and takes longer. Jackson Hole construction is priced per project and a build runs 14 to 24 months; an existing home closes in 30 to 60 days. Building wins when you already own the lot, when the listings don’t have what you want, or when you’d rather have a new envelope than a 1990s one at this snow load. The move many of my clients make is to build in Teton Valley at $400 per square foot and drive the pass. The full build-vs-buy math is in my Jackson Hole cost guide.

    Get a number you can actually hold me to

    If you want a real number on the cost to build a custom home in Teton Valley, the next step is a 30-minute planning call. We’ll talk through your lot, your scope and whether the budget carries the vision. You’ll get a straight yes or no on fit, no follow-up loops, no pressure. If you’d like to see what past clients say first, the reviews page has all nine of them.

    Or call me direct: (208) 520-0636.

    Bryce Swager, Founder, 20-year Rigby custom home builder, 4th-generation local. BuildZoom score 94. Idaho contractor registration RCE-57499.

    Building from out of state, or around a full calendar?

    Most of our clients are attorneys, engineers, and executives, many building from Texas or California. The schedule above is what it looks like when we run it on the SwagerBuilds Decision Calendar: 7–8 scheduled decision meetings, a daily photo log from your on-site project manager, and a weekly recorded video walkthrough. Here is how a custom home build works when you can’t be here.

    Watch: Teton Valley cost per square foot, from the job site

    Short answers from Bryce, filmed on site. Transcript under each one.

    Real numbers on cost per square foot in Teton Valley

    Transcript

    People ask me what a custom home cost per square foot in Teton Valley, and I'm gonna give you real numbers in this video. But first, I have to tell you why that question, just by itself, will lead you right to a bad decision. Price per square foot moves with the finishes, site conditions, and foundation

    Two houses, same size, $200,000 apart

    Transcript

    Two houses the same size on two lots can be $200,000 a park. It's the same square footage, the same floor plan. So when a builder gives you a number over the phone before he's seen your lawn, he's not quoting you, he's guessing, and you're the one who pays for that guess eight months later. It's in change orders, and then when the framing is showing up, and you have no leverage left.

    Before you sign: the numbers most builders leave out

    A per-square-foot figure describes construction only. These go deeper.